Hubert Rhomberg on sustainable building, the current timber price and a large poster. Related articles 4 minutes Construction CoV as an opportunity to strengthen the Vorarlberg location About the current CoV situation and how it can have a positive impact on Vorarlberg. 10 minutes Construction How Hubert Rhomberg is digitalising the construction industry Four sources that inspire him and four short stories to go with them. 4 minutes Construction Ahead of the ground-breaking ceremony - Construction 4.0 Contractor Hubert Rhomberg expects profound changes due to digitalisation.